{"id":3574,"date":"2026-04-14T13:53:18","date_gmt":"2026-04-14T11:53:18","guid":{"rendered":"https:\/\/www.igeas.com\/?post_type=realizzazioni&#038;p=3574"},"modified":"2026-04-24T18:23:11","modified_gmt":"2026-04-24T16:23:11","slug":"design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority","status":"publish","type":"realizzazioni","link":"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/","title":{"rendered":"Design and construction management for the new access road to the port infrastructure of Savona. Savona Port Authority."},"content":{"rendered":"<p><strong>Project objective<\/strong><\/p>\n<p>With the construction of the new access road to the Port of Savona, the aim was to provide a rapid connection between the Port and the City, taking into account the environmental impact that this work could generate, being built not only close to the city centre but also adjacent to an important archaeological site and to the Priamar Fortress (16th century).<br \/>\nThe pre-existing link road did not provide adequate functionality and often suffered from traffic congestion, with consequent impacts in terms of environmental effects such as noise and air pollution, as well as longer travel times and low levels of road safety.<br \/>\nThe project provided for the construction of a roundabout intersection connecting to the existing urban road network on the city side (Corso Mazzini); a second new roundabout was also built within the port area near Piazza Rebagliati.<br \/>\nThe new road connection runs almost entirely underground; a 295 m long cut-and-cover tunnel was constructed.<\/p>\n<p><strong>Main works<\/strong><\/p>\n<p>The intervention was carried out in accordance with the provisions of the urban planning instruments and, in particular, the \u201cMaster Plan\u201d defined by architect Bofill of Barcelona (Spain).<br \/>\nFrom an environmental-impact perspective, the alignment is entirely underground, with the surface above almost entirely allocated to green areas.<br \/>\nFor approximately two thirds of the total tunnel length, excavation was carried out in open cut, resulting in a typical closed rectangular section; the remaining part features large lateral openings on the railway-yard side.<br \/>\nThe new road axis has a carriageway platform comprising two two-way lanes, with two 3.75 m lanes and 1.75 m side shoulders, alongside which two 1.00 m-wide service sidewalks were also provided; the internal clear height at any point over the road surface is greater than 5 m.<br \/>\nThe reinforced-concrete structure was built using precast elements for the vertical structures and the slab.<br \/>\nThe design of the lighting system and the related electrical systems was also developed.<br \/>\nDuring the works, it was necessary to relocate some railway tracks that interfered with the works, as well as to construct a new Customs Gate for access to the commercial port..<\/p>\n","protected":false},"featured_media":3674,"parent":0,"template":"","settore":[26],"class_list":["post-3574","realizzazioni","type-realizzazioni","status-publish","has-post-thumbnail","hentry","settore-road-infrastructures"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Design and construction management for the new access road to the port infrastructure of Savona. Savona Port Authority. - IGEAS Engineering S.r.l.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Design and construction management for the new access road to the port infrastructure of Savona. Savona Port Authority. - IGEAS Engineering S.r.l.\" \/>\n<meta property=\"og:description\" content=\"Project objective With the construction of the new access road to the Port of Savona, the aim was to provide a rapid connection between the Port and the City, taking into account the environmental impact that this work could generate, being built not only close to the city centre but also adjacent to an important [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/\" \/>\n<meta property=\"og:site_name\" content=\"IGEAS Engineering S.r.l.\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-24T16:23:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/248_APS_Viabil_Accesso_PortoDL-1_01_2560x1707.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\\\/\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\\\/\",\"name\":\"Design and construction management for the new access road to the port infrastructure of Savona. Savona Port Authority. - IGEAS Engineering S.r.l.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/248_APS_Viabil_Accesso_PortoDL-1_01_2560x1707.jpg\",\"datePublished\":\"2026-04-14T11:53:18+00:00\",\"dateModified\":\"2026-04-24T16:23:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/248_APS_Viabil_Accesso_PortoDL-1_01_2560x1707.jpg\",\"contentUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/248_APS_Viabil_Accesso_PortoDL-1_01_2560x1707.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Realizzazioni\",\"item\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Design and construction management for the new access road to the port infrastructure of Savona. Savona Port Authority.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\",\"name\":\"IGEAS Engineering S.r.l.\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#organization\",\"name\":\"IGEAS Engineering S.r.l.\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo.png\",\"width\":800,\"height\":195,\"caption\":\"IGEAS Engineering S.r.l.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Design and construction management for the new access road to the port infrastructure of Savona. Savona Port Authority. - IGEAS Engineering S.r.l.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/","og_locale":"en_US","og_type":"article","og_title":"Design and construction management for the new access road to the port infrastructure of Savona. Savona Port Authority. - IGEAS Engineering S.r.l.","og_description":"Project objective With the construction of the new access road to the Port of Savona, the aim was to provide a rapid connection between the Port and the City, taking into account the environmental impact that this work could generate, being built not only close to the city centre but also adjacent to an important [&hellip;]","og_url":"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/","og_site_name":"IGEAS Engineering S.r.l.","article_modified_time":"2026-04-24T16:23:11+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/248_APS_Viabil_Accesso_PortoDL-1_01_2560x1707.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/","url":"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/","name":"Design and construction management for the new access road to the port infrastructure of Savona. Savona Port Authority. - IGEAS Engineering S.r.l.","isPartOf":{"@id":"https:\/\/www.igeas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/#primaryimage"},"image":{"@id":"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/#primaryimage"},"thumbnailUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/248_APS_Viabil_Accesso_PortoDL-1_01_2560x1707.jpg","datePublished":"2026-04-14T11:53:18+00:00","dateModified":"2026-04-24T16:23:11+00:00","breadcrumb":{"@id":"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/#primaryimage","url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/248_APS_Viabil_Accesso_PortoDL-1_01_2560x1707.jpg","contentUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/248_APS_Viabil_Accesso_PortoDL-1_01_2560x1707.jpg","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/www.igeas.com\/en\/projects\/design-and-construction-management-for-the-new-access-road-to-the-port-infrastructure-of-savona-savona-port-authority\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.igeas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Realizzazioni","item":"https:\/\/www.igeas.com\/en\/projects\/"},{"@type":"ListItem","position":3,"name":"Design and construction management for the new access road to the port infrastructure of Savona. Savona Port Authority."}]},{"@type":"WebSite","@id":"https:\/\/www.igeas.com\/en\/#website","url":"https:\/\/www.igeas.com\/en\/","name":"IGEAS Engineering S.r.l.","description":"","publisher":{"@id":"https:\/\/www.igeas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.igeas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.igeas.com\/en\/#organization","name":"IGEAS Engineering S.r.l.","url":"https:\/\/www.igeas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.igeas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2025\/04\/logo.png","contentUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2025\/04\/logo.png","width":800,"height":195,"caption":"IGEAS Engineering S.r.l."},"image":{"@id":"https:\/\/www.igeas.com\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/realizzazioni\/3574","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/realizzazioni"}],"about":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/types\/realizzazioni"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/media\/3674"}],"wp:attachment":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/media?parent=3574"}],"wp:term":[{"taxonomy":"settore","embeddable":true,"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/settore?post=3574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}