{"id":3791,"date":"2026-04-22T10:07:07","date_gmt":"2026-04-22T08:07:07","guid":{"rendered":"https:\/\/www.igeas.com\/?post_type=realizzazioni&#038;p=3791"},"modified":"2026-04-22T13:09:18","modified_gmt":"2026-04-22T11:09:18","slug":"brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the","status":"publish","type":"realizzazioni","link":"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/","title":{"rendered":"BRENNER BASE TUNNEL \u2013 BRENNER BASISTUNNEL BBT SE Verification for validation purposes, pursuant to Legislative Decree No. 163\/2006 and Presidential Decree 207\/2010, of the Final Design of the construction sublot \u201cMain works \u2013 Isarco undercrossing\u201d."},"content":{"rendered":"<p><strong>Description of the works under design<\/strong><\/p>\n<p>The construction lot \u201cIsarco undercrossing\u201d constitutes the southernmost end of the Brenner Base Tunnel before entering the Fortezza station area and is located approximately 1 km north of the town of Fortezza, in the Pr\u00e0 di Sopra area, in the Province of Bolzano.<br \/>\nThe construction lot \u201cIsarco undercrossing\u201d constitutes the southernmost end of the Brenner Base Tunnel before entering the Fortezza station area and is located approximately 1 km north of the town of Fortezza, in the Pr\u00e0 di Sopra area, in the Province of Bolzano.<br \/>\nThe construction lot \u201cIsarco undercrossing\u201d constitutes the southernmost end of the Brenner Base Tunnel before entering the Fortezza station area and is located approximately 1 km north of the town of Fortezza, in the Pr\u00e0 di Sopra area, in the Province of Bolzano.<\/p>\n<ul>\n<li>construction sublot \u201cPreparatory works \u2013 Isarco undercrossing\u201d, for which the Executive Design was developed under a separate assignment;<\/li>\n<li>sublot \u201cMain works \u2013 Isarco undercrossing\u201d, which is the subject of this Final Design.<\/li>\n<\/ul>\n<p><strong>Main works<\/strong><\/p>\n<p>The works subject to this verification are those related to the sublot \u201cMain works \u2013 Isarco undercrossing\u201d and mainly include the following:<\/p>\n<p><em><strong>Main tunnels<\/strong><\/em><\/p>\n<p><em>East main tunnel<\/em> \u2013 odd track (excavation and final lining of the natural sections; excavation and rough civil works in the cut-and-cover tunnel sections);<\/p>\n<p><em>West main tunnel<\/em> \u2013 even track (excavation and final lining of the natural sections; excavation and rough civil works in the cut-and-cover tunnel sections);<\/p>\n<p>The tunnel excavation ends in rock. Portal works are not included in this lot.<\/p>\n","protected":false},"featured_media":2189,"parent":0,"template":"","settore":[30],"class_list":["post-3791","realizzazioni","type-realizzazioni","status-publish","has-post-thumbnail","hentry","settore-underground-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BRENNER BASE TUNNEL \u2013 BRENNER BASISTUNNEL BBT SE Verification for validation purposes, pursuant to Legislative Decree No. 163\/2006 and Presidential Decree 207\/2010, of the Final Design of the construction sublot \u201cMain works \u2013 Isarco undercrossing\u201d. - IGEAS Engineering S.r.l.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BRENNER BASE TUNNEL \u2013 BRENNER BASISTUNNEL BBT SE Verification for validation purposes, pursuant to Legislative Decree No. 163\/2006 and Presidential Decree 207\/2010, of the Final Design of the construction sublot \u201cMain works \u2013 Isarco undercrossing\u201d. - IGEAS Engineering S.r.l.\" \/>\n<meta property=\"og:description\" content=\"Description of the works under design The construction lot \u201cIsarco undercrossing\u201d constitutes the southernmost end of the Brenner Base Tunnel before entering the Fortezza station area and is located approximately 1 km north of the town of Fortezza, in the Pr\u00e0 di Sopra area, in the Province of Bolzano. The construction lot \u201cIsarco undercrossing\u201d constitutes [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/\" \/>\n<meta property=\"og:site_name\" content=\"IGEAS Engineering S.r.l.\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-22T11:09:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/312_BV-BBT_Op_Princ_Sott_Isarco-0-2-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"992\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\\\/\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\\\/\",\"name\":\"BRENNER BASE TUNNEL \u2013 BRENNER BASISTUNNEL BBT SE Verification for validation purposes, pursuant to Legislative Decree No. 163\\\/2006 and Presidential Decree 207\\\/2010, of the Final Design of the construction sublot \u201cMain works \u2013 Isarco undercrossing\u201d. - IGEAS Engineering S.r.l.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/312_BV-BBT_Op_Princ_Sott_Isarco-0-2-scaled.jpg\",\"datePublished\":\"2026-04-22T08:07:07+00:00\",\"dateModified\":\"2026-04-22T11:09:18+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/312_BV-BBT_Op_Princ_Sott_Isarco-0-2-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/312_BV-BBT_Op_Princ_Sott_Isarco-0-2-scaled.jpg\",\"width\":2560,\"height\":992},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Realizzazioni\",\"item\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"BRENNER BASE TUNNEL \u2013 BRENNER BASISTUNNEL BBT SE Verification for validation purposes, pursuant to Legislative Decree No. 163\\\/2006 and Presidential Decree 207\\\/2010, of the Final Design of the construction sublot \u201cMain works \u2013 Isarco undercrossing\u201d.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\",\"name\":\"IGEAS Engineering S.r.l.\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#organization\",\"name\":\"IGEAS Engineering S.r.l.\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo.png\",\"width\":800,\"height\":195,\"caption\":\"IGEAS Engineering S.r.l.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BRENNER BASE TUNNEL \u2013 BRENNER BASISTUNNEL BBT SE Verification for validation purposes, pursuant to Legislative Decree No. 163\/2006 and Presidential Decree 207\/2010, of the Final Design of the construction sublot \u201cMain works \u2013 Isarco undercrossing\u201d. - IGEAS Engineering S.r.l.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/","og_locale":"en_US","og_type":"article","og_title":"BRENNER BASE TUNNEL \u2013 BRENNER BASISTUNNEL BBT SE Verification for validation purposes, pursuant to Legislative Decree No. 163\/2006 and Presidential Decree 207\/2010, of the Final Design of the construction sublot \u201cMain works \u2013 Isarco undercrossing\u201d. - IGEAS Engineering S.r.l.","og_description":"Description of the works under design The construction lot \u201cIsarco undercrossing\u201d constitutes the southernmost end of the Brenner Base Tunnel before entering the Fortezza station area and is located approximately 1 km north of the town of Fortezza, in the Pr\u00e0 di Sopra area, in the Province of Bolzano. The construction lot \u201cIsarco undercrossing\u201d constitutes [&hellip;]","og_url":"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/","og_site_name":"IGEAS Engineering S.r.l.","article_modified_time":"2026-04-22T11:09:18+00:00","og_image":[{"width":2560,"height":992,"url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/312_BV-BBT_Op_Princ_Sott_Isarco-0-2-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/","url":"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/","name":"BRENNER BASE TUNNEL \u2013 BRENNER BASISTUNNEL BBT SE Verification for validation purposes, pursuant to Legislative Decree No. 163\/2006 and Presidential Decree 207\/2010, of the Final Design of the construction sublot \u201cMain works \u2013 Isarco undercrossing\u201d. - IGEAS Engineering S.r.l.","isPartOf":{"@id":"https:\/\/www.igeas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/#primaryimage"},"image":{"@id":"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/#primaryimage"},"thumbnailUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/312_BV-BBT_Op_Princ_Sott_Isarco-0-2-scaled.jpg","datePublished":"2026-04-22T08:07:07+00:00","dateModified":"2026-04-22T11:09:18+00:00","breadcrumb":{"@id":"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/#primaryimage","url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/312_BV-BBT_Op_Princ_Sott_Isarco-0-2-scaled.jpg","contentUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/312_BV-BBT_Op_Princ_Sott_Isarco-0-2-scaled.jpg","width":2560,"height":992},{"@type":"BreadcrumbList","@id":"https:\/\/www.igeas.com\/en\/projects\/brenner-base-tunnel-brenner-basistunnel-bbt-se-verification-for-validation-purposes-pursuant-to-legislative-decree-no-163-2006-and-presidential-decree-207-2010-of-the-final-design-of-the\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.igeas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Realizzazioni","item":"https:\/\/www.igeas.com\/en\/projects\/"},{"@type":"ListItem","position":3,"name":"BRENNER BASE TUNNEL \u2013 BRENNER BASISTUNNEL BBT SE Verification for validation purposes, pursuant to Legislative Decree No. 163\/2006 and Presidential Decree 207\/2010, of the Final Design of the construction sublot \u201cMain works \u2013 Isarco undercrossing\u201d."}]},{"@type":"WebSite","@id":"https:\/\/www.igeas.com\/en\/#website","url":"https:\/\/www.igeas.com\/en\/","name":"IGEAS Engineering S.r.l.","description":"","publisher":{"@id":"https:\/\/www.igeas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.igeas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.igeas.com\/en\/#organization","name":"IGEAS Engineering S.r.l.","url":"https:\/\/www.igeas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.igeas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2025\/04\/logo.png","contentUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2025\/04\/logo.png","width":800,"height":195,"caption":"IGEAS Engineering S.r.l."},"image":{"@id":"https:\/\/www.igeas.com\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/realizzazioni\/3791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/realizzazioni"}],"about":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/types\/realizzazioni"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/media\/2189"}],"wp:attachment":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/media?parent=3791"}],"wp:term":[{"taxonomy":"settore","embeddable":true,"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/settore?post=3791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}