{"id":3811,"date":"2026-04-22T11:21:19","date_gmt":"2026-04-22T09:21:19","guid":{"rendered":"https:\/\/www.igeas.com\/?post_type=realizzazioni&#038;p=3811"},"modified":"2026-04-22T11:25:11","modified_gmt":"2026-04-22T09:25:11","slug":"ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas","status":"publish","type":"realizzazioni","link":"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/","title":{"rendered":"SS No. 27 \u201cGran San Bernardo\u201d \u2013 Road upgrading works between Etroubles and the motorway junction for the Gran San Bernardo tunnel \u2013 Variant bypassing the built-up areas of Etroubles and Saint-Oyen from km 15+180 to km 18+700 (re-tender)."},"content":{"rendered":"<p><strong>Project objective<\/strong><\/p>\n<p>The design scope consisted of completing the bypass variant of the built-up areas of Etroubles and Saint-Oyen, from km 15+180 to km 18+700 of SS 27 \u201cGran San Bernardo\u201d, connecting Etroubles to Cret through the St. Oyen natural tunnel, replacing the existing alignment that crosses several villages towards the Tunnel.<br \/>\nAt the time, tunnel excavation and lining works were only partially executed, from the North portal up to chainage 1,883.00 and from the South portal up to chainage 1,012.20, due to instability phenomena and significant water inflows.<br \/>\nThe works also include the Window Tunnel, intended as an emergency exit, fully excavated but with the final lining not completed along its entire length.<br \/>\nOther completion activities concerned, in Etroubles, the viaduct over the Artanavaz Stream connecting the South portal of the tunnel to the roundabout junction with SS 27 and, in Cret, a second viaduct with on- and off-ramps connecting to the existing State Road.<\/p>\n<p><strong>Main works of competence<\/strong><\/p>\n<p><em>St. Oyen Tunnel<\/em><br \/>\nTo reconstruct the geological framework ahead of the remaining section to be excavated, forward investigations were carried out consisting of two 200 m continuous-core boreholes drilled from the two excavation faces at the work stoppage points, collecting samples for laboratory testing, performing in-hole dilatometer tests, investigating the presence of water in the rock mass and carrying out borehole video inspections.<br \/>\nThe outcomes of these investigations enabled the definition of stabilisation interventions for the homogeneous sections identified.<\/p>\n<p><em>Window Tunnel<\/em><br \/>\nConnected to the main alignment approximately at mid-length (chainage 1+928.57 km), orthogonal to it, with an overall length of about 492 m: the completion of the final lining (invert arch and\/or crown) was redesigned over almost the entire length where not executed in segments, together with the waterproofing, consistent with the excavation geometry in the crossover connection area with the main tunnel.<\/p>\n","protected":false},"featured_media":2520,"parent":0,"menu_order":19,"template":"","settore":[26,30],"class_list":["post-3811","realizzazioni","type-realizzazioni","status-publish","has-post-thumbnail","hentry","settore-road-infrastructures","settore-underground-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>SS No. 27 \u201cGran San Bernardo\u201d \u2013 Road upgrading works between Etroubles and the motorway junction for the Gran San Bernardo tunnel \u2013 Variant bypassing the built-up areas of Etroubles and Saint-Oyen from km 15+180 to km 18+700 (re-tender). - IGEAS Engineering S.r.l.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SS No. 27 \u201cGran San Bernardo\u201d \u2013 Road upgrading works between Etroubles and the motorway junction for the Gran San Bernardo tunnel \u2013 Variant bypassing the built-up areas of Etroubles and Saint-Oyen from km 15+180 to km 18+700 (re-tender). - IGEAS Engineering S.r.l.\" \/>\n<meta property=\"og:description\" content=\"Project objective The design scope consisted of completing the bypass variant of the built-up areas of Etroubles and Saint-Oyen, from km 15+180 to km 18+700 of SS 27 \u201cGran San Bernardo\u201d, connecting Etroubles to Cret through the St. Oyen natural tunnel, replacing the existing alignment that crosses several villages towards the Tunnel. At the time, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/\" \/>\n<meta property=\"og:site_name\" content=\"IGEAS Engineering S.r.l.\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-22T09:25:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/363_ANAS_SS27_Etroubles_AO-0-3-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\\\/\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\\\/\",\"name\":\"SS No. 27 \u201cGran San Bernardo\u201d \u2013 Road upgrading works between Etroubles and the motorway junction for the Gran San Bernardo tunnel \u2013 Variant bypassing the built-up areas of Etroubles and Saint-Oyen from km 15+180 to km 18+700 (re-tender). - IGEAS Engineering S.r.l.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/363_ANAS_SS27_Etroubles_AO-0-3-scaled.jpg\",\"datePublished\":\"2026-04-22T09:21:19+00:00\",\"dateModified\":\"2026-04-22T09:25:11+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/363_ANAS_SS27_Etroubles_AO-0-3-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/363_ANAS_SS27_Etroubles_AO-0-3-scaled.jpg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Realizzazioni\",\"item\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SS No. 27 \u201cGran San Bernardo\u201d \u2013 Road upgrading works between Etroubles and the motorway junction for the Gran San Bernardo tunnel \u2013 Variant bypassing the built-up areas of Etroubles and Saint-Oyen from km 15+180 to km 18+700 (re-tender).\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\",\"name\":\"IGEAS Engineering S.r.l.\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#organization\",\"name\":\"IGEAS Engineering S.r.l.\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo.png\",\"width\":800,\"height\":195,\"caption\":\"IGEAS Engineering S.r.l.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"SS No. 27 \u201cGran San Bernardo\u201d \u2013 Road upgrading works between Etroubles and the motorway junction for the Gran San Bernardo tunnel \u2013 Variant bypassing the built-up areas of Etroubles and Saint-Oyen from km 15+180 to km 18+700 (re-tender). - IGEAS Engineering S.r.l.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/","og_locale":"en_US","og_type":"article","og_title":"SS No. 27 \u201cGran San Bernardo\u201d \u2013 Road upgrading works between Etroubles and the motorway junction for the Gran San Bernardo tunnel \u2013 Variant bypassing the built-up areas of Etroubles and Saint-Oyen from km 15+180 to km 18+700 (re-tender). - IGEAS Engineering S.r.l.","og_description":"Project objective The design scope consisted of completing the bypass variant of the built-up areas of Etroubles and Saint-Oyen, from km 15+180 to km 18+700 of SS 27 \u201cGran San Bernardo\u201d, connecting Etroubles to Cret through the St. Oyen natural tunnel, replacing the existing alignment that crosses several villages towards the Tunnel. At the time, [&hellip;]","og_url":"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/","og_site_name":"IGEAS Engineering S.r.l.","article_modified_time":"2026-04-22T09:25:11+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/363_ANAS_SS27_Etroubles_AO-0-3-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/","url":"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/","name":"SS No. 27 \u201cGran San Bernardo\u201d \u2013 Road upgrading works between Etroubles and the motorway junction for the Gran San Bernardo tunnel \u2013 Variant bypassing the built-up areas of Etroubles and Saint-Oyen from km 15+180 to km 18+700 (re-tender). - IGEAS Engineering S.r.l.","isPartOf":{"@id":"https:\/\/www.igeas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/#primaryimage"},"image":{"@id":"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/#primaryimage"},"thumbnailUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/363_ANAS_SS27_Etroubles_AO-0-3-scaled.jpg","datePublished":"2026-04-22T09:21:19+00:00","dateModified":"2026-04-22T09:25:11+00:00","breadcrumb":{"@id":"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/#primaryimage","url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/363_ANAS_SS27_Etroubles_AO-0-3-scaled.jpg","contentUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/363_ANAS_SS27_Etroubles_AO-0-3-scaled.jpg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/www.igeas.com\/en\/projects\/ss-no-27-gran-san-bernardo-road-upgrading-works-between-etroubles-and-the-motorway-junction-for-the-gran-san-bernardo-tunnel-variant-bypassing-the-built-up-areas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.igeas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Realizzazioni","item":"https:\/\/www.igeas.com\/en\/projects\/"},{"@type":"ListItem","position":3,"name":"SS No. 27 \u201cGran San Bernardo\u201d \u2013 Road upgrading works between Etroubles and the motorway junction for the Gran San Bernardo tunnel \u2013 Variant bypassing the built-up areas of Etroubles and Saint-Oyen from km 15+180 to km 18+700 (re-tender)."}]},{"@type":"WebSite","@id":"https:\/\/www.igeas.com\/en\/#website","url":"https:\/\/www.igeas.com\/en\/","name":"IGEAS Engineering S.r.l.","description":"","publisher":{"@id":"https:\/\/www.igeas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.igeas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.igeas.com\/en\/#organization","name":"IGEAS Engineering S.r.l.","url":"https:\/\/www.igeas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.igeas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2025\/04\/logo.png","contentUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2025\/04\/logo.png","width":800,"height":195,"caption":"IGEAS Engineering S.r.l."},"image":{"@id":"https:\/\/www.igeas.com\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/realizzazioni\/3811","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/realizzazioni"}],"about":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/types\/realizzazioni"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/media\/2520"}],"wp:attachment":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/media?parent=3811"}],"wp:term":[{"taxonomy":"settore","embeddable":true,"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/settore?post=3811"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}