{"id":3990,"date":"2026-04-22T13:25:25","date_gmt":"2026-04-22T11:25:25","guid":{"rendered":"https:\/\/www.igeas.com\/?post_type=realizzazioni&#038;p=3990"},"modified":"2026-04-22T13:29:25","modified_gmt":"2026-04-22T11:29:25","slug":"motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187","status":"publish","type":"realizzazioni","link":"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/","title":{"rendered":"Motorway A4\/A5 \u2013 A5 Torino\u2013Quincinetto Ivrea hydraulic node \u2013 2nd completion phase Executive Structural Design of Overpass No. 25 at km 40+187."},"content":{"rendered":"<p><strong>Project objective<\/strong><\/p>\n<p>The objective of this project is the construction of the new Overpass No. 25 at km 40+187 (crossing point of the A5 Torino\u2013Aosta motorway by Provincial Road SP 222 \u2013 Municipality of Banchette), replacing the existing structure, which will be demolished. The bridge consists of two simply supported spans with a composite steel\u2013concrete deck: a main span of 42.50 m (distance between supports) over the motorway carriageway, and a secondary span of 27.85 m (distance between supports) over a local road running parallel to the motorway.<\/p>\n<p><strong>Main works<\/strong><\/p>\n<p>The new Overpass No. 25 is a two-span simply supported bridge with a composite steel\u2013concrete deck: steel main girders and cross-beams acting compositely with a reinforced-concrete slab connected by studs, ensuring torsional stiffness and durability.<br \/>\nThe structure is supported on reinforced-concrete abutments and a central pier founded on foundations designed to safely transfer actions to the ground and to accommodate bearings and joints in accordance with motorway standards. Bridge-edge safety barriers, barrier kerbs, water management (deck waterproofing and drainage), and reinstatement of pavement layers and signage at the tie-ins are included.<br \/>\nThe overall intervention is designed for Use Class IV, with solutions consistent with the local geotechnical and seismic framework and with the integration of the new structure within the existing road context.<\/p>\n","protected":false},"featured_media":2497,"parent":0,"menu_order":5,"template":"","settore":[31],"class_list":["post-3990","realizzazioni","type-realizzazioni","status-publish","has-post-thumbnail","hentry","settore-bridges-and-viaducts"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Motorway A4\/A5 \u2013 A5 Torino\u2013Quincinetto Ivrea hydraulic node \u2013 2nd completion phase Executive Structural Design of Overpass No. 25 at km 40+187. - IGEAS Engineering S.r.l.<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Motorway A4\/A5 \u2013 A5 Torino\u2013Quincinetto Ivrea hydraulic node \u2013 2nd completion phase Executive Structural Design of Overpass No. 25 at km 40+187. - IGEAS Engineering S.r.l.\" \/>\n<meta property=\"og:description\" content=\"Project objective The objective of this project is the construction of the new Overpass No. 25 at km 40+187 (crossing point of the A5 Torino\u2013Aosta motorway by Provincial Road SP 222 \u2013 Municipality of Banchette), replacing the existing structure, which will be demolished. The bridge consists of two simply supported spans with a composite steel\u2013concrete [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/\" \/>\n<meta property=\"og:site_name\" content=\"IGEAS Engineering S.r.l.\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-22T11:29:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/358_ATIVA_Eng_Sovrappasso-25-0-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1551\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\\\/\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\\\/\",\"name\":\"Motorway A4\\\/A5 \u2013 A5 Torino\u2013Quincinetto Ivrea hydraulic node \u2013 2nd completion phase Executive Structural Design of Overpass No. 25 at km 40+187. - IGEAS Engineering S.r.l.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/358_ATIVA_Eng_Sovrappasso-25-0-1-scaled.jpg\",\"datePublished\":\"2026-04-22T11:25:25+00:00\",\"dateModified\":\"2026-04-22T11:29:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/358_ATIVA_Eng_Sovrappasso-25-0-1-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/358_ATIVA_Eng_Sovrappasso-25-0-1-scaled.jpg\",\"width\":2560,\"height\":1551},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Realizzazioni\",\"item\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/projects\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Motorway A4\\\/A5 \u2013 A5 Torino\u2013Quincinetto Ivrea hydraulic node \u2013 2nd completion phase Executive Structural Design of Overpass No. 25 at km 40+187.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\",\"name\":\"IGEAS Engineering S.r.l.\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#organization\",\"name\":\"IGEAS Engineering S.r.l.\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.igeas.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo.png\",\"width\":800,\"height\":195,\"caption\":\"IGEAS Engineering S.r.l.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.igeas.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Motorway A4\/A5 \u2013 A5 Torino\u2013Quincinetto Ivrea hydraulic node \u2013 2nd completion phase Executive Structural Design of Overpass No. 25 at km 40+187. - IGEAS Engineering S.r.l.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/","og_locale":"en_US","og_type":"article","og_title":"Motorway A4\/A5 \u2013 A5 Torino\u2013Quincinetto Ivrea hydraulic node \u2013 2nd completion phase Executive Structural Design of Overpass No. 25 at km 40+187. - IGEAS Engineering S.r.l.","og_description":"Project objective The objective of this project is the construction of the new Overpass No. 25 at km 40+187 (crossing point of the A5 Torino\u2013Aosta motorway by Provincial Road SP 222 \u2013 Municipality of Banchette), replacing the existing structure, which will be demolished. The bridge consists of two simply supported spans with a composite steel\u2013concrete [&hellip;]","og_url":"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/","og_site_name":"IGEAS Engineering S.r.l.","article_modified_time":"2026-04-22T11:29:25+00:00","og_image":[{"width":2560,"height":1551,"url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/358_ATIVA_Eng_Sovrappasso-25-0-1-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/","url":"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/","name":"Motorway A4\/A5 \u2013 A5 Torino\u2013Quincinetto Ivrea hydraulic node \u2013 2nd completion phase Executive Structural Design of Overpass No. 25 at km 40+187. - IGEAS Engineering S.r.l.","isPartOf":{"@id":"https:\/\/www.igeas.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/#primaryimage"},"image":{"@id":"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/#primaryimage"},"thumbnailUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/358_ATIVA_Eng_Sovrappasso-25-0-1-scaled.jpg","datePublished":"2026-04-22T11:25:25+00:00","dateModified":"2026-04-22T11:29:25+00:00","breadcrumb":{"@id":"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/#primaryimage","url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/358_ATIVA_Eng_Sovrappasso-25-0-1-scaled.jpg","contentUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2026\/03\/358_ATIVA_Eng_Sovrappasso-25-0-1-scaled.jpg","width":2560,"height":1551},{"@type":"BreadcrumbList","@id":"https:\/\/www.igeas.com\/en\/projects\/motorway-a4-a5-a5-torino-quincinetto-ivrea-hydraulic-node-2nd-completion-phase-executive-structural-design-of-overpass-no-25-at-km-40187\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.igeas.com\/en\/"},{"@type":"ListItem","position":2,"name":"Realizzazioni","item":"https:\/\/www.igeas.com\/en\/projects\/"},{"@type":"ListItem","position":3,"name":"Motorway A4\/A5 \u2013 A5 Torino\u2013Quincinetto Ivrea hydraulic node \u2013 2nd completion phase Executive Structural Design of Overpass No. 25 at km 40+187."}]},{"@type":"WebSite","@id":"https:\/\/www.igeas.com\/en\/#website","url":"https:\/\/www.igeas.com\/en\/","name":"IGEAS Engineering S.r.l.","description":"","publisher":{"@id":"https:\/\/www.igeas.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.igeas.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.igeas.com\/en\/#organization","name":"IGEAS Engineering S.r.l.","url":"https:\/\/www.igeas.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.igeas.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.igeas.com\/wp-content\/uploads\/2025\/04\/logo.png","contentUrl":"https:\/\/www.igeas.com\/wp-content\/uploads\/2025\/04\/logo.png","width":800,"height":195,"caption":"IGEAS Engineering S.r.l."},"image":{"@id":"https:\/\/www.igeas.com\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/realizzazioni\/3990","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/realizzazioni"}],"about":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/types\/realizzazioni"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/media\/2497"}],"wp:attachment":[{"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/media?parent=3990"}],"wp:term":[{"taxonomy":"settore","embeddable":true,"href":"https:\/\/www.igeas.com\/en\/wp-json\/wp\/v2\/settore?post=3990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}