BRENNER BASE TUNNEL – BRENNER BASISTUNNEL BBT SE Verification for validation purposes, pursuant to Legislative Decree No. 163/2006 and Presidential Decree 207/2010, of the Final Design of the construction sublot “Main works – Isarco undercrossing”.
Client | Bureau Veritas Italia S.p.A. |
Location | Northern Italy |
Period | 2013 |
Works value | € 345.000.000 |
Service | Final Design verification – appointed inspectors |
Description of the works under design
The construction lot “Isarco undercrossing” constitutes the southernmost end of the Brenner Base Tunnel before entering the Fortezza station area and is located approximately 1 km north of the town of Fortezza, in the Prà di Sopra area, in the Province of Bolzano.
The construction lot “Isarco undercrossing” constitutes the southernmost end of the Brenner Base Tunnel before entering the Fortezza station area and is located approximately 1 km north of the town of Fortezza, in the Prà di Sopra area, in the Province of Bolzano.
The construction lot “Isarco undercrossing” constitutes the southernmost end of the Brenner Base Tunnel before entering the Fortezza station area and is located approximately 1 km north of the town of Fortezza, in the Prà di Sopra area, in the Province of Bolzano.
- construction sublot “Preparatory works – Isarco undercrossing”, for which the Executive Design was developed under a separate assignment;
- sublot “Main works – Isarco undercrossing”, which is the subject of this Final Design.
Main works
The works subject to this verification are those related to the sublot “Main works – Isarco undercrossing” and mainly include the following:
Main tunnels
East main tunnel – odd track (excavation and final lining of the natural sections; excavation and rough civil works in the cut-and-cover tunnel sections);
West main tunnel – even track (excavation and final lining of the natural sections; excavation and rough civil works in the cut-and-cover tunnel sections);
The tunnel excavation ends in rock. Portal works are not included in this lot.